Fall 2014 - Hole Location
Tree Dam Core (site 1) information
Core 100 |
|
|
Short Operations
Reports (when available) |
Field
Geologic
Descriptions of Core PW refers to Pore Water Samples PSS refers to "shoe samples" taken from the bit or end of core and placed in ziplock bags |
Core Pictures | |
Other Analyses and Information |
Presho/Presho Core Hole fall 2014-logistics(2) | ||
Misc pictures |
short movies of coring | MSDS sheets | |
electric logs |
hydrocarbon occurrences | Data acquired at NETL |
===========================================================================================
Spring drilling and coring at the general Presho location started March 2015 and operations concluded June 2015.