Fall 2014 - Hole Location

Tree Dam Core (site 1) information

Presho - Fall 2014

Core 100 Core 100 group  
     
Short Operations Reports (when available)
 Field Geologic Descriptions of Core
PW refers to Pore Water Samples
PSS refers to "shoe samples" taken from the bit or end of core and placed in ziplock bags
Core Pictures  


Other Analyses and Information
Presho/Presho Core Hole fall 2014-logistics(2)    
       

Misc pictures
short movies of coring MSDS sheets  

electric logs
hydrocarbon occurrences Data acquired at NETL  

 

===========================================================================================

Presho - Spring 2015

Spring drilling and coring at the general Presho location started March 2015 and operations concluded June 2015.