Hole M51-2015-2
This hole was started while the Mobile coring rig was waiting on parts. The current plan is to rotary down to the Carlile Shale and electric log the hole. This is anticipated to require a depth of ~900 ft at this location.
The rationale for this is to provide better insight as to when to expect the Niobrara Fm. and provide guidance for DOE NETL efforts.
Potential issues with the electric logs appear to have been resolved in general although the logging unit will be checked out during latter part of the week of April 13. See operations for more information.
DENR-SDGS description of cuttings ( http://www.sddenr.net/lithdb/ )
Hole M51-2015-2 (4-15-2015]