2015 Operations

  Monday Tuesday Wednesday Thursday
Week of  March 30 3/30 Moved ENID rig to M51-2015-1 and began rotary drilling.
Drilled 100'
3/31 Drilled 100-380' 4/1 Drilled 38-475'  

Week of April 6
Did not occupy site      
Week of April 13 4/13 Circulated/cleared out hole to 475' (M51-2015-1). Tried to log but hung up at ~399'. 




4/14 Tried to log but hung up at ~399' (same depth as previous day). Moved ENID rig off. Moved Mobile coring rig to M51-2015-1. Prepared to core. Mobile coring rig developed gasket problem with BEAN pump. Waiting on parts.
4/15 Moved ENID rig to M51-2015-2 and rotary drilled 0 - 200'.  Adjusted electrical ground on logging unit and logged newly drilled hole twice to establish repeatability. Unit appears to be functioning. 4/16 Drilling ahead with ENID rig at M51-2015-2.
Week of April 20 On site Monday afternoon. Rotary drilled with M51 rig to 280 ft. Repaired R20 rig and cored 474-479' (the elevation of this site is ~50 ft lower than Presho hole from the fall).



M51 rig drilling ahead -- drilled depth at end of day 480 ft.

R20froze up at beginning of day due to unexpected drop in night temperatures; cleaned out water system and cored ahead; acquired cores 2-7 and ended at 509 ft depth.
   
         
Week of May 25 decision made to shut down coring and acquire electric logs  working on cleaning out hole for electric logging problem with wire rope for handling drill pipe repairing rig
Week of June 1