Sept 8 operations
Rig was moved previously to the site and was set up upon arrival of the crew at ~1200 hrs. Geologists present included Sarah Chadima, Ann Jensen, Jay Nopola, and W. Roggenthen. Drilling crew included Ted Miller, Scott Jensen, and Jim Olson. Started with auger at 1500 hrs. Drilled to 67 ft. Stood down for the day.