Sept 29 operations
On site and coring at 1430 hrs. Sped up RPM on engine to 2500 RPM. Time and statistics for core are as follows:
Core 34 57 min. RPM 2500
Core 35 58 min. down pressure 250 psi; fluid presure 200 psi; RPM 2500
Core 36 59 min. RPM 2500; all other parameters the same as above.
Finished coring for the day at 1748 hrs and commenced core recovery, core prep, and rig down.
Total drilling for day: 15 ft and 3 cores. Core quality and recovery excellent.
Personnel on site:
Ted Miller | Scott Jensen | Jim Olson | Ann Jensen |
Sarah Chadima | Dan Soeder, DOE | Rebecca Rodriguez, DOE | W. Roggenthen |