Sept 29 operations

On site and coring at 1430 hrs.  Sped up RPM on engine to 2500 RPM. Time and statistics for core are as follows:

Core 34   57 min.  RPM 2500

Core 35  58 min.  down pressure 250 psi; fluid presure 200 psi; RPM 2500

Core 36  59 min.  RPM 2500;  all other parameters the same as above.

Finished coring for the day at 1748 hrs and commenced core recovery, core prep, and rig down.

 

Total drilling for day:   15 ft and 3 cores.  Core quality and recovery excellent.

Personnel on site:

Ted Miller Scott Jensen Jim Olson Ann Jensen
Sarah Chadima Dan Soeder, DOE Rebecca  Rodriguez, DOE W. Roggenthen