Sept 23 operations

 

Went in hole with coring tools at 0950.  Ceaned out hole.  Began coring at 1030 with 400 psi down pressure and 300 psi fluid pressure. In the afternoon measured flow rate of drilling fluid at 22 gpm. Cored all day and recovered 15 feet of excellent core.  Shut down coring at 1730 for the day.